Sign In | Join Free | My lightneasy.org
China Shandong Weimeng Construction Machinery Co., Ltd logo
Shandong Weimeng Construction Machinery Co., Ltd
Shandong Weimeng Construction Machinery Co., Ltd
Verified Supplier

2 Years

Home > Hydraulic Wheel Loader >

High Efficiency 3 Ton Front End Wheel Loader For Heavy Infrastructure

Shandong Weimeng Construction Machinery Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Efficiency 3 Ton Front End Wheel Loader For Heavy Infrastructure

Place of Origin : Shandong, China

Certification : ISO9001,CE,EAC

MOQ : 1

Price : negotiate

Packaging Details : standard packaging

Delivery Time : 5-8 day

Payment Terms : negotiate

Machinery Test Report : Provided

Video outgoing-inspection : Provided

Moving Type : Wheel Loader

Application : Farm work, garden work, indoor work...

Color : Yellow, red, orange, blue or customized

Attachments : Quick hitch, pallet fork or customized

Contact Now

3 ton front-end wheel loader can be applied on mining,quarries and aggregates,heavy infrastructure,road construction and so on.The transmission we used is Beilian transmission or Hangzhou Advance transmission.Both of them have hydraulic power shift and after equipped with transmission,our 3 ton front-end wheel loader is much easier to operate and also high efficiency.After years of market validation,these two kinds of transmissions which are popular among clients from different countries,are good quality and have a long service life.The whole frame is enhanced so that the machine is stronger and also can be able to work for a very long time and to accomplish tasks in a dangerous and harsh environment.Here is the specification.

Performance Loader lifting capacity 3000KG
Operating weight 10000KG
Rated bucket capacity 1.8m³
Max. tractive force 97KN
Max. breakout force 127KN
Max. grade ability 30°
Max. dump height 3100mm
Max. dump reach 1130mm
Overall dimension(L×W×H) 7180×2350×3230mm
Min. turning radius 6250mm
Engine

Model

Weichai

Type Inline, water-cooled, four stroke
Cylinder-Inner diameter×stroke 6-108×130mm
Rated power 92KW

Maximum torque

500N.m

Min fuel-consumption ratio

≤213g/kw.h


Transmission system
Torque converter YJ320B-1

Gearbox mode

Powershift engaged straight gear

Gear shift

4 forward shift and 2 reverse shift

Maximum speed

38km/h

Drive axles Wheel base

2758mm

Wheel tread

1800mm

Ground clearance

400mm

Hydraulic system System working pressure 16Mpa
Boom lifting time 4.83s
Total time 9.15±0.5s
Fuel tank capacity 170L
Self-levelling bucket yes
Brake system Service brake Air assist disc brake on 4 wheels
Parking brake Manual brake
Tire

Tire specification

17.5-25

Front tire pressure

0.4Mpa

Rear tire pressure

0.35Mpa

High Efficiency 3 Ton Front End Wheel Loader For Heavy Infrastructure


Buy cheap High Efficiency 3 Ton Front End Wheel Loader For Heavy Infrastructure product

High Efficiency 3 Ton Front End Wheel Loader For Heavy Infrastructure Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Weimeng Construction Machinery Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)